New builds

How construction loans work: progress payments, interest and what lenders need

Building is financed differently from buying. Here is how the money flows from your lender to your builder, what you pay along the way, and where builds usually go wrong financially.

By Joshua James, Ace Lending Solutions. Updated 21 October 2026. Figures checked against the sources listed below.

The short version

A construction loan pays your builder in stages as the work is done, rather than in one amount at settlement. The lender pays a stage only once it is complete, and you generally pay interest only on the amount drawn so far. When the home is finished, the loan usually rolls into a standard principal and interest home loan.

Progress payments: how the build is paid for

Building contracts set out stages, and state law limits how much a builder can ask for at each. In Victoria the law sets both the deposit and the stage payments for a contract to build all stages:

Victoria: deposit and stage payments for a contract to build all stages
StageShare of the contract priceComplete when
DepositUp to 5% (contracts of $20,000 or more)On signing
Base10%Footings and slab (or floor structure) complete
Frame15%Frame complete and approved by the building surveyor
Lock up35%External walls, roof, flooring, external doors and windows fixed
Fixing25%Internal linings, doors, cabinets, fixtures fitted
CompletionThe balance (10%)Practical completion and handover
Consumer Affairs Victoria. Other states use similar stages; in NSW the deposit on residential building work can't exceed 10%, and for jobs over $20,000 the builder must have home building compensation cover before you pay it.

Before each payment, the lender usually sends a valuer or inspector to confirm the stage is done, then pays the builder directly once you authorise it. Check the work has passed the building surveyor's inspection and matches your contract before you sign off.

Your money goes in first

Lenders generally require your own contribution (your deposit, plus any part of the cost the loan won't cover) to be used before they start funding stages. So if the land and build cost more than the loan, the gap has to be paid early, not at the end. That is the single most common surprise on a build.

What you pay during construction

While the home is being built you usually pay interest only on the drawn balance. Repayments start low (interest on the land, if the land was financed) and rise with each stage. If you are renting at the same time, budget for rent and rising interest together for as long as the build takes, and allow for delays.

What lenders look at

Risks to plan for

Common questions

Do you pay principal and interest during construction?

Usually not. Most construction loans charge interest only on the amount drawn while the home is being built, then switch to principal and interest when it's finished.

Can I get a First Home Owner Grant on a build?

Yes, in every state except the ACT, if you meet the conditions. The grant is for new homes, and building one is the main way first home buyers qualify. Amounts and value caps differ by state: see first home buyers.

How much deposit do I need to build?

Lenders' requirements are similar to buying, but your own money usually has to go in first, and you also need to cover stamp duty on the land and any cost above the valuation. The Borrowable check works out the cash you need.

Sources

General information only, not credit advice. It doesn’t take your objectives, financial situation or needs into account. Rules and figures change; check them, or talk to Joshua, before you rely on them.